Evin-Darakeh Project

Brief

Evin-Darakeh project which includes concrete-rock canals, open concrete canals and covered concrete canals with 4.5 m width and 2,100 m length and also resting pools is constructed between Pole-e-Modiriat and Koy-e-Nasr to convey surface water of north region to south region.

Details

Total work based on primary contract

102,000

Earthwork

12,000

Formwork

534,000 Kg

Steelwork

12,000

Cast in place concrete

Facts

Type of structure Reinforced concrete canal
Length 2,100 m
Dimensions W: 4,500 mm   H: 3,500 mm
Main works
Earthworks of different parts of canal
Construction of canal’s bed
Construction of canal’s walls
Construction of box culvert canal
Construction of concrete canal
Other works
Drainage of back part of the walls with concrete pipes and rock
Earthworks of back part of the walls of canal, preparing and installing of water stop
LocationWest of Tehran
Start date1995
Duration12 Months
Client Tehran Municipality – Khakrizab Co.
Consultant Deputyship of Supervision and Execution of Engineering and Improvement Organization of Tehran city.